Smart home installation in Dubai: costs and timeline

Home AI team
Published · Updated · 3 min read

Typical budget ranges and installation times for apartments and villas in Dubai, what moves the price, and what a proper quote should list.

Two questions come up on almost every first call: how much, and how long. Here are the ranges we work with, what pushes a project up or down, and what to have ready so the quote is based on your home and not a guess.

Typical budgets

These are project-level ranges, covering equipment, installation and programming:

ScopeTypical range
Single room: smart lighting and switchesAED 2,000-5,000
2-3 bedroom apartment: lighting, curtains, basic securityAED 15,000-35,000
3-4 bedroom villa: lighting, curtains, climate, security, audioAED 40,000-80,000
Complete villa automation, fully integratedAED 25,000-150,000+

The villa range is wide because "complete" means very different things. A villa with lighting, AC control and a few cameras sits at the lower end. Add motorised curtains throughout, multi-room audio, a home theatre and outdoor lighting and you move towards the top. The same ranges are on our resources page.

What moves the price

Size and layout

More rooms means more switches, sensors and programming. Multi-storey villas also need more network access points and longer cable runs.

Existing wiring

A new build or a home with conduits and structured cabling is the easiest case. Retrofitting an occupied villa with finished walls takes more care, and we lean on wireless devices (Zigbee switches, battery sensors, retrofit curtain motors) to avoid chasing walls. Most of the retrofits we do finish without wall damage, but the site survey decides what is possible.

How integrated it is

Devices that each run from their own app cost less to set up than a system where lighting, AC, curtains, cameras and audio share scenes and automations. Integration is mostly programming time, and it is where the real value is.

Equipment choice

The same function can be done at different price points. We'll show you where spending more pays off, for example on switches and locks built into walls and doors, and where it doesn't.

Network and electrical work

If your Wi-Fi can't cover the home, it needs upgrading before anything else will work reliably. Older properties sometimes need electrical work too. Both are identified at the site survey and listed in the quote, so they don't show up later as extras.

How long it takes

On-site installation, network setup, testing and training usually take:

  • Single room: 1-2 days
  • 2-3 bedroom apartment: 3-5 days
  • 4-5 bedroom villa with full automation: 7-14 days
  • Commercial and office spaces: 1-3 weeks, depending on size

Before that comes the site survey, design and proposal, then ordering equipment. Most of what we install is available in the UAE, but specific models sometimes need to be ordered in, so confirm lead times when you approve the quote. In occupied villas we often work in phases to keep disruption down.

On a new build or renovation, the timeline follows the fit-out programme: cabling at first-fix, devices at second-fix, programming and commissioning near the end.

Ongoing costs to ask about

  • Cloud subscriptions, mostly for camera recording and some doorbell features.
  • Maintenance or support plans, if you want scheduled checks.
  • Future additions. If you plan to expand, say so at the start so the hub, network and wiring are sized for it.

Products we supply carry a 1-year manufacturer's warranty.

How to get an accurate quote

Send whoever is quoting:

  • Floor plans, or photos of each room if you don't have plans.
  • Your priorities, in order.
  • Details of your AC system (split, central, fan coil or VRF), since that decides how climate control works.
  • Any existing devices, speakers or wiring you want to keep.
  • A budget range, so the design fits it from the start.

A proper proposal itemises equipment (models and quantities), installation, programming, training, warranty terms and any ongoing costs. Payments are usually staged against milestones. Be wary of large upfront payments and of single-line quotes with no detail.

For developers and contractors

On projects, cost depends on the specification and unit count more than on room size, and the timeline is set by the construction programme. Bringing us in at design stage lets us price from drawings and coordinate first-fix with the MEP contractor. See how we work with project teams.

For a figure based on your home, ask us for a quote or book a home consultation.